Customization: | Available |
---|---|
After-sales Service: | Oversea Engineer/Online Video Call |
Warranty: | 12 Months |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction for jacketed kettle cooking machine
Jjacketed kettle mainly consists of rack, kettle body, burner, agitation paddle, tilting equipment and gas pipeline. The rack is used for installing and fixing kettle body and other equipment. The kettle body is main part of making food and the burner is for heating kettle body. Agitation paddle can stir and fry food automatically instead of artificial agitator. The tilting equipment can overturn the kettle body.
Structure Type: Tiltable Jacketed Kettle, Vertical (fixed) Jacketed Kettle
Heating Type: Electric Heating Jacketed Kettle, Steam Heating Jacketed Kettle, Gas Heating Jacketed Kettle
Mixing Type: with agitator, without agitator
Whether to be with/without agitator depends on processing needs.
Technical parameter of jacketed kettle with agitator
JK-600 | |||||||
600L | |||||||
sus304 | |||||||
170kg | |||||||
Heat transfer oil volume (kg) | 500kg | 600kg | 700kg | 800kg | 1000kg | 1300kg | 1500kg |
Stirring power (kw) | 0.37kw | 0.55kw | 0.55kw | 0.75kw | 0.75kw | 1.5kw | 2.2kw |
Electric heating power (Kw) | 18kw | 18kw | 24kw | 30kw | 30kw | 36kw | 36kw |
2.3 | |||||||
550kg | |||||||
1900*1600*1850mm |
1. About Delivery term
Q: What's the delivery term for doing business with you?
A: EXW/FOB/CIF/DDU… it depends on preference of clients.
2. About Lead time
Q: What's the leading time after placing order?
A: After getting your confirmation, mixing tank about 25 days, pump 15 days, colloid mill 10 days. However, it depends on production schedule is in slack or peak season, and the complication of machines.
3. About Payment time
Q: What's the payment term?
A: T/T 40% as down payment, 60% balance payment before delivery.
4. About Quality
Q: How do you control your quality?
A: All machines before delivery will be tested and send video for customer, if no problem then arrange balance payment. Meanwhile,CE is available for customers' needs.
5. About Packing
Q: How do you pack the machines?
A: Standard export wooden case, to avoid damage during delivery.
6. About Customized
Q: Can you produce according to the samples?
A: Yes,we can produce by your samples or technical drawings.